I am still setting things up but hope to have the downstairs part done by the end of this weekend. No big surprise that the 4-6 weeks that the contractor told me turned into 3-1/2 months so it wasn't finished by them until a couple weeks ago. Once they were done, I then installed the flooring and baseboards (still finishing those up) on those 3-day weekends I took in July as that's the only blocks of time I had and now it's moving everything in so it's a bit of a disaster zone at the moment.
I have been taking pictures of the progress and will share more later but the yarn/weaving area is the closest to being fully set up so here's a preview from a couple angles. Really should have moved the trash bag and taken another picture but will do that later when I'm finally done. The "disaster zone" is on the other side of the room behind the hutch and bookcase (you're seeing the back of that).
View attachment 22556 View attachment 22557